update kava-5.1 migration guide

This commit is contained in:
karzak 2021-03-26 08:57:28 -06:00
parent 54c0793ced
commit b80c18506e

View File

@ -4,8 +4,8 @@
* We will be upgrading from chain-id "kava-6" to chain-id "kava-5.1". This is to keep the features in our roadmap aligned with the features on mainnet going forward.
* The version of Kava for kava-5.1 is v0.14.0
* Kava-6 validators should prepare to shutdown their nodes March 24th, 2021 at 13:00 UTC by setting `--halt-time` to `1616590800`
* Kava-5.1 genesis time is set to March 24th, 2021 at 15:00 UTC
* Kava-6 validators should prepare to shutdown their nodes March 31st, 2021 at 13:00 UTC by setting `--halt-time` to `1617195600`
* Kava-5.1 genesis time is set to March 31st, 2021 at 15:00 UTC
* The version of cosmos-sdk for kava-5.1 is v0.39.2
* The version of tendermint for kava-5.1 v0.33.9
* The minimum version of golang for kava-5.1 is 1.13+, 1.15+ has been tested and is recommended.
@ -28,17 +28,17 @@ In the event that the upgrade does not succeed, validators and operators must do
### Before the upgrade
Set your node to produce the final block of kava-6 at __13:00__ UTC March 24th, 2021. To restart your node with that stop time,
Set your node to produce the final block of kava-6 at __13:00__ UTC March 31st, 2021. To restart your node with that stop time,
```sh
kvd start --halt-time 1616590800
kvd start --halt-time 1617195600
```
You can safely set the halt-time flag at any time.
### On the day of the upgrade
__The kava chain is expected to halt at 13:00 UTC, and restart with new software at 15:00 UTC March 24th. Do not stop your node and begin the upgrade before 13:00UTC on March 24th, or you may go offline and be unable to recover until after the upgrade!__
__The kava chain is expected to halt at 13:00 UTC, and restart with new software at 15:00 UTC March 31st. Do not stop your node and begin the upgrade before 13:00UTC on March 31st, or you may go offline and be unable to recover until after the upgrade!__
Kava developers will update this PR with the final block number when it is reached. __Make sure the kvd process is stopped before proceeding and that you have backed up your validator__. Failure to backup your validator could make it impossible to restart your node if the upgrade fails.
@ -88,4 +88,4 @@ __Note:__ This can take a while!
### Coordination
If the kava-5.1 chain does not launch by March 24, 2021 at 17:00 UTC, the launch should be considered a failure and validators should refer to the [rollback]("./rollback.md") instructions to restart the previous kava-6 chain. In the event of launch failure, coordination will occur in the [Kava discord](https://discord.com/invite/kQzh3Uv).
If the kava-5.1 chain does not launch by March 31, 2021 at 17:00 UTC, the launch should be considered a failure and validators should refer to the [rollback]("./rollback.md") instructions to restart the previous kava-6 chain. In the event of launch failure, coordination will occur in the [Kava discord](https://discord.com/invite/kQzh3Uv).